Tuesday, June 13, 2006

Tractor building construction

Construction is under way on the tractor building. The bees which were living under the building in the back ground are eliminated.

Nancy is standing there looking at the construction. The crew expects to get the roof on today so they can work in the shade. I think the criss crossed straps are to make the whole thing sturdier. That is a 15 X 30 foot slab and this will house two tractors as well as all my gas powered tools and an air conditioned shop at the South end which is not visible in the first picture. The second picture shows the pear tree for which I moved the slab site a few feet. I would have cut it down, but Nancy wanted me to leave it. To the far left is a peach tree which almost yields a peach each year. It gets the blossoms then the weather takes over and we seldom see a peach reach maturity.

Maybe in a week I can move in to this new building. More later…

Tractor Boy